Defence

Project: Defence Case Study

Warrior Handle
  • Cost effective design for manufacture

  • Load Testing

  • Assembly

High-Tech has just completed an order for a Firing Pin Mechanism for the Warrior Fighting Vehicle.

The assembly required several special jigs and fixtures all designed by the company along with Load Test equipment.

A manufacture for production analysis incorporating design changes was a service provided during the initial prototype stage ensuring the 13 parts required were made efficiently and cost effectively.

Working closely with customer design engineers a series of load test equipment was also designed and manufactured by High-Tech Engineering in order to offer a complete turnkey solution. 