Motor Sports

Project: Motorsports Case Study

Cosworth housing
  • Solid model programming

  • Offline inspection programming

  • 4th Axis manufacture 

A requirement for an urgent wind tunnel test jig manufactured from solid had to be produced with limited 2D drawing information.

Utilising solid model data an initial manufacturing analysis was undertaken to ensure a cost effective solution.

The programming of the part using limited 2D information was produced with off line inspection as part of a production sequence to reduce overall timescales.

At each stage of the manufacturing process inspection programmes were ready and waiting for the part to arrive in the Quality Dept.

The completed part was delivered on time enabling a successful test to be completed. 